The City of Rockingham has released a flythrough video of what the Aqua Jetty will look like after its Stage Two major refurbishment.
Stage two will include the development of a wellness suite including a larger hydrotherapy pool, along with sauna, and steam rooms.
There are three adult change facilities proposed throughout the facility as well as a number of universal accessible toilets and family change facilities.
An expanded ‘learn to swim pool’ will be developed, which will help in alleviating the demand on other water spaces at the facility.
The leisure pool will also be redesigned to accommodate a new interactive splash pad and water play areas, and the water slide area will also be redesigned and expanded.
A larger gymnasium and group fitness spaces are a key part of the concept design.
The café, crèche and reception will be relocated to the front of the building, with more car parks being included in the design process.
Construction is expected to begin mid-2023.
The flythrough video is an indicative representation of the design of the Aqua Jetty Stage 2 project.
The final product may differ.

'Prognosis terrifying' for young boy struck by car in Cooloongup
K9 Rescue's long-term resident in desperate search for loving home
West Coast Radio announcer Darragh O’Dea takes out Best Local Show at Australian Audio Awards
Lucky escape for two people after boat smashes into Mandurah Estuary Bridge
Secret Harbour Golf Links to host WA's most prestigious golf tournament
Upgrades begin on Kwinana Loop Trail
Shire of Harvey councillors vote in favour of city status
Erskine syndicate shares in division one Lotto win
Man accused of chasing down boy in Greenfields car park before assaulting him and stealing bicycle
